Frequently Asked Questions and Precautions
Q: Does dust accumulate in the relief grooves? How to clean?
A: With pattern depth of 2–5mm, routine dust accumulation is minimal. Use a vacuum with a brush attachment or soft brush swept along the pattern direction. For deep cleaning, apply neutral cleaner spray and lightly brush grooves with a soft toothbrush, then wipe with a slightly damp cloth. Avoid high-pressure air which may re-deposit airborne dust.
Q: How to handle gaps between the skirting top edge and the wall?
A: Pre-formed buffer grooves accept sealing strips or caulking. Ensure wall flatness ≤2mm over 2m before installation. For gaps ≤3mm, apply neutral mold-resistant sealant along the top edge and smooth. For gaps >3mm, level the wall locally or use a clip-mounting system with elastic compensation.
Q: Is this skirting suitable for rooms with radiant floor heating?
A: Yes. Choose WPC (thermal conductivity 0.25–0.35 W/(m·K)) or SPC (0.35–0.45 W/(m·K)) substrates for minimal heat dissipation impact. Leave a 3–5mm expansion gap between skirting bottom and floor, filled with a transition strip or sealant. Avoid PVC substrate (thermal conductivity ~0.17 W/(m·K), softening risk at prolonged >40°C exposure).
Q: How to join sections along long walls?
A: Use supplied butt joint connectors or 45° miter cuts. For butt joints, apply adhesive to both ends, insert connector, and clamp for 24 hours. For 45° miters (corners), ensure cutting angle accuracy ±0.5°, And fill joints with matching color repair putty.
Precautions
Condition skirting and installation environment at room temperature (15–25°C) for 24 hours before installation to allow material acclimatization.
Wall substrate must be dry (moisture content ≤10%), sound, and free of dust, oil, and loose coatings. Mark installation baseline with a laser level.
Use fine-tooth saw blades (≥80 teeth) for cutting. Deburr cut ends with 200-grit sandpaper. For pattern areas, cut at pattern intervals rather than through major motif centers.
For bathroom dry areas or kitchens, apply mold-resistant sealant at the skirting-wall top joint and waterproof sealant at the skirting-floor bottom joint.
Avoid strong acids/alkalis (oxalic acid, sodium hydroxide) or abrasive tools (steel wool) that may damage the decorative surface layer.
Store horizontally on dry ground with soft separators between pieces. Avoid direct sunlight and high temperatures (>45°C). Stack height ≤1.2M.
Avoid wet mopping floors or extensive water exposure to walls within 72 hours after installation to allow complete adhesive curing.